Dropped kerbs & vehicle crossovers in Macclesfield

In short

Forming the lowered kerb and strengthened footway that lets you legally drive from the road onto your property. It needs Cheshire East's consent under section 184 of the Highways Act 1980, the council sets the specification, and it runs on its own timetable — so it starts early, not last.

Also called: Dropped kerb application · Vehicle crossover · Kerb lowering · Drive access onto the road

Signs you need this

  • Parking on the road because there is no legal way onto the frontage
  • Bumping up a full-height kerb to get onto your own drive
  • Cracked footway flags or a damaged kerb where you drive over
  • A drive that has been widened past the existing crossover
  • Clipping the kerb every time you swing in
  • Buying a house with an off-street parking area but no dropped kerb

The pavement and the kerb outside your house are not yours. They belong to the highway authority — Cheshire East Council — and driving a vehicle across a footway without a properly constructed crossover is an offence. It is also a practical problem: a footway is built for people, not for cars, so repeatedly driving over it cracks the flags, damages the kerb and can break the utility apparatus that runs underneath.

So forming a crossover needs the council's consent under section 184 of the Highways Act 1980, and the council decides both whether it is acceptable and how it is built. The considerations are road safety rather than convenience: visibility in both directions, the width and gradient of the access, proximity to a junction, a bus stop, a pedestrian crossing or a street tree, whether losing an on-street parking space is acceptable, and what is buried under the footway.

There is a second consent people frequently miss. Where the drive comes out onto a classified road — an A, B or C road — planning permission is required as well as the highway consent, because the permitted development right that covers a new access does not extend to classified roads. On an unclassified residential street the highway consent alone is usually enough. Getting that wrong is a genuinely expensive mistake.

The construction is specified by the council rather than by preference, and it is heavier than most people expect. It normally means the existing kerb line taken out and dropped kerbs and transition kerbs set on a concrete bed and haunch, the footway construction strengthened to take vehicles, the surface reinstated to the council's specification, and any statutory undertaker's apparatus — gas, water, electricity, telecoms — protected or diverted. In most cases the work has to be done by a contractor the council has approved to work in the highway.

Timescales are the thing to plan around. An application goes in, the council inspects, and there may be conditions or a request for changes. Where utilities need moving, the utility company sets its own programme, which can add months and real cost — a gas or electricity chamber sitting exactly where the crossover has to go is the single most common source of delay and expense. None of that fits into the week the blocks arrive.

It is also worth thinking about what the crossover has to serve, not just whether one is allowed. A crossover narrower than the drive means clipping the kerb every time you turn in, which damages the kerb and the edge of your drive. A crossover on a busy road wants enough room on the property to turn round rather than reverse out. And on a terraced street where the houses are built hard against the pavement — which the Macclesfield Character Assessment describes as characteristic of the town's silk-era cottages — there may simply be no frontage to drive onto, and that is a straight answer worth getting early.

What the job covers

  • An early view on whether a crossover is likely to be acceptable here
  • Application to Cheshire East under section 184 of the Highways Act 1980
  • Planning permission identified where the road is classified
  • Utility apparatus located and diversion arranged where needed
  • Kerbs and transitions set on a concrete bed and haunch
  • Footway construction strengthened to the council's specification
  • Work carried out by a contractor approved to work in the highway
  • Crossover width set to match the drive so you are not clipping the kerb

What it costs

We don't publish a price for this yet, because a number pulled out of the air is worse than no number at all — your contractor has to honour it. On driveways it would also be close to meaningless: the groundworks are usually the biggest single factor, and how deep the dig has to go varies enormously house to house. You'll get a firm price for your actual job when they ring you back, before any work starts. The quote itself is free and there's no obligation either way.

Common questions

Can I just drive over the kerb until I get one done?

It is an offence to drive a vehicle across a footway without a proper crossover, and the council can require the damage to be made good at your cost. It also breaks flags and can damage buried services. Practically, it is also the thing most likely to prompt a complaint from a neighbour and an approach from the council.

How long does a dropped kerb take to arrange?

Weeks at best and months where utilities are involved. The application, the inspection and any conditions take time, and if a gas or electricity chamber sits where the crossover has to go, that utility company sets its own programme and its own price. It is the first thing to start and the last thing to be able to rush.

Do I need planning permission as well?

Only where the access comes out onto a classified road — an A, B or C road — in which case yes, planning permission is needed in addition to the highway consent. On an ordinary unclassified residential street the section 184 consent is normally sufficient. It is worth confirming which yours is before assuming.

Can an application be refused?

Yes, and on safety grounds rather than aesthetic ones — poor visibility, proximity to a junction or crossing, an unacceptable gradient, a street tree in the way, or the loss of on-street parking where that matters. On a terrace built hard against the pavement there may be no frontage to drive onto at all. It is worth establishing early rather than after a drive has been designed round it.

Need this doing in Macclesfield?

Tell us the job and it goes straight to our local contractor — one call back, usually the same day. Free quote, no obligation.

← All kerbs, edgings & groundworks jobs