New driveways & driveway replacement in Macclesfield
A driveway is roughly nine-tenths groundwork and one-tenth the bit you look at. What decides whether it lasts five years or twenty-five is the excavation, the compaction, the sub-base and where the water goes — and none of that is visible on the day it is handed over. That is the honest reason two quotes for the same drive can be thousands apart, and why the cheaper one is very often quoting a shallower hole.
The sequence barely changes whatever the surface. Dig out to a depth set by the ground and the traffic, put a geotextile membrane down if the subgrade is soft, build back up in compacted layers of crushed stone, form and haunch the edges, then lay the surface on top. Tarmac, blocks, resin and imprinted concrete all sit on that same build-up. Choose the surface last, after the drainage and the levels are settled.
Not every tired drive needs replacing. A sound concrete or tarmac base with a scruffy surface is a resurfacing job, and resin or a tarmac overlay will take twenty years off how it looks for a fraction of a full rebuild. A base that is moving, cracked through and holding water is not — putting a new surface on that is money spent twice, and it will telegraph the old cracks through within a couple of winters.
The drainage question is not optional here, and it is not just good practice. Since October 2008 an impermeable surface of more than five square metres in a front garden has needed planning permission unless the water is drained to somewhere permeable within your own boundary. In Macclesfield that rule bites harder than it does elsewhere: Cheshire East's flood risk assessment names the town as the borough's only designated Flood Risk Area, with 47 internal flooding incidents recorded since 2011.
New driveways & replacement — every job, in detail.
2 jobs in this category. Each has its own page explaining what's involved, what your contractor checks and — just as importantly — when a job can safely wait.
New driveway installation
A new driveway laid from the ground up: excavation to a depth set by the ground and the traffic, a compacted crushed-stone sub-base, restrained edges, drainage that satisfies the front-garden planning rule, and then the surface of your choice on top. The quote states the dig depth in writing before anything starts.
Read more →Driveway replacement
Taking up a drive that has reached the end rather than patching it again. The old surface and any failed base come out, the ground is rebuilt properly, and the new surface goes down on a build-up that suits how you actually use the drive. The first question asked is always whether it genuinely needs replacing.
Read more →Not sure which one you need?
Describe it in your own words on the quote form. Your contractor will work out what the job actually is when they ring you back — usually the same day.
Got a driveway job? Let's get it sorted.
Tell us what you need and it goes straight to our Macclesfield driveway contractor — one callback, usually the same day. The quote is free and there's no obligation.