New driveway installation in Macclesfield
In short
A new driveway laid from the ground up: excavation to a depth set by the ground and the traffic, a compacted crushed-stone sub-base, restrained edges, drainage that satisfies the front-garden planning rule, and then the surface of your choice on top. The quote states the dig depth in writing before anything starts.
Also called: New driveway · Driveway installation · Driveway fitters · Driveway company near me
Signs you need this
- No off-street parking, and a front garden big enough to convert
- An old drive that is cracked, sunken or moving rather than just tired
- Standing water on the drive, or water running towards the house
- A gravel or worn area that has never had a proper base under it
- A second car with nowhere to go
- Buying a house where the drive was flagged in the survey
A new driveway is a groundworks job with a decorative finish, and almost every difference between a good one and a bad one is buried before the surface goes down. The excavation depth, whether a membrane went in, how many layers the stone was compacted in, whether the edges were bedded and haunched in concrete, and where the rain is going — those five things decide whether you get five years or twenty-five. None of them are visible on handover day, which is exactly why they belong in the written quote.
The sequence is much the same whatever you choose to walk on. The area is set out and dug down to formation, normally somewhere around 200–250mm below finished level for a domestic drive and deeper on soft ground or where a heavier vehicle parks. A geotextile membrane goes over the subgrade where it is needed, to stop the stone and the soil migrating into each other. Crushed stone sub-base goes in and is whacked in layers rather than in one lift. Edgings are set on concrete with a haunch behind them. Then, and only then, the surface.
Choosing the surface is the last decision, not the first. Block paving, tarmac, resin bound, imprinted concrete, gravel and stone all sit on that same build-up, so the honest conversation is about how you use the drive, how it drains, what the house looks like and how much maintenance you want — not about a brochure. What is decided early is the drainage, because in a front garden that is a legal question rather than an aesthetic one.
That legal question is the one most homeowners have never heard of. Since 1 October 2008, laying more than five square metres of impermeable surface in the front garden of a house in England has needed planning permission — unless the water is directed to somewhere permeable within your own boundary, such as a lawn, a border or a soakaway. Choose a permeable surface, or drain a solid one properly, and no application is needed. Choose an impermeable one that runs onto the pavement and, strictly, you have built without permission.
Levels and thresholds get worked out at the same time. A drive should fall away from the house, and the finished surface should sit at least 150mm below the damp proof course. Where a garage floor or a door threshold makes that impossible — which it often does on a house where the ground has been built up over the years — the answer is a linear channel across the opening, designed in from the start rather than added after the first time the garage floods.
One practical note about how the work runs. Expect a skip or a grab lorry, several tonnes of muck away, and a drive you cannot park on for the duration. Most domestic drives are a three to seven day job depending on size, surface and whether a crossover is being formed. Resin bound and imprinted concrete both need dry weather and a cure period on top of that, so the programme is honest about the forecast rather than optimistic about it.
What the job covers
- Site set-out, levels and falls agreed before anything is dug
- Excavation to formation, with the depth stated in the quote
- Muck away by a registered waste carrier, with a transfer note
- Geotextile membrane where the subgrade needs it
- Compacted crushed-stone sub-base laid and whacked in layers
- Concrete-bedded and haunched edgings to every free edge
- Drainage designed to keep the drive inside permitted development
- Your chosen surface laid, and the site left clean
What it costs
We don't publish a price for this yet, because a number pulled out of the air is worse than no number at all — your contractor has to honour it. On driveways it would also be close to meaningless: the groundworks are usually the biggest single factor, and how deep the dig has to go varies enormously house to house. You'll get a firm price for your actual job when they ring you back, before any work starts. The quote itself is free and there's no obligation either way.
Common questions
How long does a new driveway take?
Most domestic drives run three to seven days from first dig to finished surface, depending on size, the surface chosen and whether a dropped kerb is being formed at the same time. Resin bound and imprinted concrete both need a dry window and a cure period afterwards, so they are more weather-dependent than block paving or tarmac. A crossover application to Cheshire East runs on its own timetable and should be started weeks ahead of the drive.
Do I need planning permission?
For a front garden, only if you lay more than five square metres of impermeable surface AND the water is not directed to a permeable area within your own property. A permeable surface, or a solid one draining to a soakaway or a border, stays permitted development. Rear gardens are not caught by the rule at all. Conservation areas and listed buildings are the exception — there, check with Cheshire East planning before ordering anything.
How deep should the dig be?
For a normal car on normal ground, expect the finished level to sit around 200–250mm above formation, made up of compacted sub-base plus the laying course and the surface. Soft or clay subgrade, a slope, or somewhere a van or a motorhome parks all push that deeper. The number that matters is the one written on your quote — a quote that gives a rate per square metre and no depth is not telling you what you are buying.
Can you lay it over the existing drive?
Sometimes, and it is worth checking before pricing a full dig. A sound, stable concrete or tarmac base that is simply tired is an excellent foundation for a resin or tarmac overlay. A base that is cracked right through, moving, or holding water is not — an overlay will reflect those cracks through within a couple of winters. The honest test is what the base is doing, not what it looks like.
Need this doing in Macclesfield?
Tell us the job and it goes straight to our local contractor — one call back, usually the same day. Free quote, no obligation.