Skip to content

Patios & paved garden areas in Macclesfield

In short

A patio built with the same discipline as a driveway — dug out, compacted base, full mortar bed, falls away from the house and the finished surface kept clear of the damp proof course. The bedding and the levels are what separate a patio that lasts from one that rocks and puddles.

Also called: New patio · Patio laying · Paving a garden · Patio installation

Signs you need this

  • Slabs that rock, sound hollow or have cracked
  • Water standing on the patio after rain
  • Paving level with or above the damp proof course
  • Joints cracked out, empty or full of weeds
  • A patio that has settled away from the house or towards it
  • Wanting a new paved area to match a new drive

A patio is a driveway that does not have to carry a car, and that changes the depths and not much else. It still wants excavating to formation, a compacted crushed-stone base, a proper bedding layer, restrained edges and falls that take water away from the house. Most failed patios failed for exactly the reasons failed driveways do — they were built on nothing much, and the water was never thought about.

Bedding is where the biggest difference in quality sits, and it is invisible once the slabs are down. Paving should go on a full mortar bed, with a cement slurry primer brushed onto the back of each unit so the mortar bonds to it. The alternative, which is extremely common, is dab bedding — five blobs of mortar per slab — which leaves most of the underside hollow. Those slabs rock, crack, let water into the voids and lift in frost, and every one of those problems traces back to the same shortcut.

Falls and threshold levels are the other half, and they matter more on a patio than on a drive because a patio is usually against the house. Paving should fall away from the building at roughly 1:80 — enough to shed water, not enough to feel like a slope — and the finished surface should sit at least 150mm below the damp proof course. Where a door threshold makes that impossible, the correct answer is a linear channel or a slot drain across the doorway, not building up to the door and hoping.

Jointing decides how the patio ages. Joints want to be wide enough and deep enough to fill properly, and filled with a proper mortar or a resin jointing compound rather than dry sand and cement brushed in and watered — which never gains strength and cracks out within a couple of winters. Once joints have failed, water gets into the bed, frost lifts the slabs, and a jointing job has become a relaying job.

Material choice is the enjoyable part and it follows the same logic as a drive. Porcelain is dense, non-porous, frost-resistant and stain-resistant, and needs a slurry primer without exception. Sandstone is warm, textured, porous and benefits from sealing. Yorkstone is the local material and looks right on older property. Concrete paving has come a long way and is good value. All of them work on a proper base and all of them fail on a poor one.

One thing worth planning for at the design stage rather than regretting: where the patio drains to. A large paved area against a house sheds a lot of water, and running it into a border that then washes onto the paving, or into a gully that is already at capacity, causes problems within a season. A permeable build-up, a soakaway or a properly sized channel gets designed in — and, unlike a front garden, a rear patio is not caught by the front-garden planning rule, so the choice is a practical one rather than a regulatory one.

What the job covers

  • Excavation to formation and compacted crushed-stone base
  • Full mortar bed with a slurry primer to the back of each unit
  • Falls set away from the house at around 1:80
  • Finished level kept at least 150mm below the damp proof course
  • Threshold drainage where levels make that impossible
  • Edges restrained and, where needed, retained
  • Joints formed wide and deep, filled with mortar or resin compound
  • Drainage designed rather than discovered after the first storm

What it costs

We don't publish a price for this yet, because a number pulled out of the air is worse than no number at all — your contractor has to honour it. On driveways it would also be close to meaningless: the groundworks are usually the biggest single factor, and how deep the dig has to go varies enormously house to house. You'll get a firm price for your actual job when they ring you back, before any work starts. The quote itself is free and there's no obligation either way.

Common questions

Can paving be laid on mortar dabs?

It should not be. Dab bedding leaves most of the slab unsupported, so it rocks, cracks under load, holds water in the voids and lifts in frost. A full mortar bed with a slurry primer costs a little more in materials and considerably less over the life of the patio. If a quote does not say full bed, ask what it does say.

How far below the damp proof course does a patio need to be?

At least 150mm, so that splashing rain and any standing water cannot bridge into the wall. Where a door threshold makes that impossible — which is common on older houses where ground levels have been built up — a linear channel or slot drain across the doorway is the proper solution rather than paving up to the door.

Do I need planning permission for a patio?

Generally not. The permitted development rule about impermeable surfacing applies to front gardens; rear gardens are not caught by it. A raised patio or deck can need permission if it is significantly above ground level, and conservation areas and listed buildings have their own requirements. For an ordinary ground-level rear patio, no application is normally needed.

Why have my patio joints cracked out?

Almost always because they were too narrow to fill properly, or filled with a dry sand-and-cement mix brushed in and watered, which never gains strength. Raking out and repointing with a proper mortar or a resin jointing compound fixes it. Skimming new material over the old failed joints buys about one winter.

Need this doing in Macclesfield?

Tell us the job and it goes straight to our local contractor — one call back, usually the same day. Free quote, no obligation.

← All patios, paths & extras jobs

Got a driveway job? Let's get it sorted.

Tell us what you need and it goes straight to our Macclesfield driveway contractor — one callback, usually the same day. The quote is free and there's no obligation.