Skip to content

Garden paths, side access & steps

In short

Paths, side access and steps built properly rather than laid on the soil — the small jobs that get skipped and then get walked on every day. Grip, drainage and a firm edge matter more on a path than anywhere else, because this is where people actually fall.

Also called: New garden path · Side of house path · Muddy path · Path to the back door

Signs you need this

  • A muddy, worn route that has become a path by use
  • Slabs rocking or tipping along a path
  • A side passage that is slippery every winter
  • Water running off a path towards the house wall
  • Steps of uneven height or with no fall on the treads
  • A path too narrow for the bin, the barrow or a pushchair

Paths get built worse than any other hard surface because they seem too small to bother with, and they get used more than almost anything else. The path down the side of the house is walked on every bin day, in the dark, in the rain, usually carrying something. It is worth building properly, and building properly means the same sequence as everything else: dig out, membrane where the ground is soft, compacted stone, then the surface on a proper bed with restrained edges.

Grip is the consideration that matters most and gets thought about least. A path in permanent shade down the north side of a house stays damp all winter, grows algae, and becomes genuinely slippery — and a fall on a path is the commonest domestic accident there is. Textured surfaces, riven stone, setts, resin bonded and self-binding gravel all give real grip. Smooth polished porcelain and worn old flags do not, and on a shaded path that is a specification decision rather than a preference.

Drainage on a path is usually about where it discharges rather than about the path itself. A path with a cross-fall sheds its water into whatever is beside it, which is fine if that is a border and a problem if it is the house wall or a neighbour's boundary. On a narrow side passage — of which this town's terraces have a great many — that water has nowhere useful to go, and a small channel drain running to a gully often solves a decade-old problem for very little money.

Widths are worth a moment's thought. A path that has to take a wheelie bin, a wheelbarrow or a pushchair wants to be genuinely wide enough — 900mm to a metre rather than the 600mm that so many side paths are — and a bin dragged along a path narrower than it is will chew the edges and the planting. Where there is no room, a firm, well-drained surface without a raised edge to catch on is the next best answer.

Steps are where paths become a safety issue and want getting right. Consistent rise and going matter enormously — a single step that is different from the others is exactly what trips people — and treads want a slight fall so water runs off rather than sitting on them. A handrail on anything more than a couple of steps is worth having, particularly on an approach used by anybody less steady. None of that costs much at construction and all of it is awkward to add later.

The good news about paths is that they are cheap to do well relative to a driveway, because the depths are shallower and the loads are trivial. A properly built path costs a fraction of a drive and lasts as long, and it is a sensible thing to add to a driveway job while the crew, the machinery and the muck-away are already on site rather than as a separate visit.

What the job covers

  • Excavation, membrane and compacted stone base as for any hard surface
  • Surface chosen for grip, especially on shaded and sloping routes
  • Cross-falls set so water leaves the path somewhere sensible
  • Small channel or gully where a narrow passage has nowhere to shed to
  • Edges restrained so the path does not spread into the borders
  • Steps built to a consistent rise and going with a fall on the treads
  • Handrail provision where the approach needs one
  • Width set for what actually gets carried along it

What it costs

We don't publish a price for this yet, because a number pulled out of the air is worse than no number at all — your contractor has to honour it. On driveways it would also be close to meaningless: the groundworks are usually the biggest single factor, and how deep the dig has to go varies enormously house to house. You'll get a firm price for your actual job when they ring you back, before any work starts. The quote itself is free and there's no obligation either way.

Common questions

My side path is slippery every winter. What fixes it?

Two things together. A textured surface — riven stone, setts, resin bonded, self-binding gravel — gives real grip where smooth flags do not. And getting the path to dry means dealing with why it stays wet: a cross-fall, a small channel drain, or cutting back whatever is shading and dripping on it. Cleaning alone treats the symptom every spring.

How wide should a path be?

Wider than most are. Around 900mm to a metre if a bin, a barrow or a pushchair goes along it; 600mm is fine for occasional foot access and nothing else. Where there is genuinely no room, avoid a raised edge that can catch a foot or a wheel and make sure the surface drains, since a narrow path is exactly where people trip.

Can a path be laid straight onto the soil?

It can, and it will sink, rock and go muddy at the edges within a couple of winters. The depths for a path are much shallower than for a drive because there is no vehicle load, so building it properly is genuinely cheap — a modest dig, a membrane on soft ground, compacted stone and a proper bed. It is not worth skipping to save so little.

Is it cheaper to do a path at the same time as the drive?

Considerably, yes. The machinery, the crew, the materials delivery and the muck-away are already on site, so the marginal cost of a path is much lower than a separate visit. If a path is on the list at all, it is worth pricing it into the driveway job rather than treating it as next year's work.

Need this doing in Macclesfield?

Tell us the job and it goes straight to our local contractor — one call back, usually the same day. Free quote, no obligation.

← All patios, paths & extras jobs

Got a driveway job? Let's get it sorted.

Tell us what you need and it goes straight to our Macclesfield driveway contractor — one callback, usually the same day. The quote is free and there's no obligation.